PROJECTS DONE IN IRAQ

 
  • Chevron Iraq (Sarta) Limited KRI Sarta Stage 1A EPF Project
  • CPS7 Upgrade
  • CS6 Compression Tie Ins
  • Early Power Plant Project – Rumaila Oil Field
  • ESSO Polymer Flood Project
  • FCP Gas Project – Majnoon
  • FCP Offsite Water Intake Station
  • FRR 329 NR NGL & CS Unit Train Isolations 
  • RPP Critical Operating Spares & Training Resources (IQ5004)
  • Majnoon Sour Gas Treatment Facility
  • Rafidiya Compressor Station
  • Rehabilitation of Iraq Gas Facilities Tuba Tie Back Project
  • North Rumaila New Compressor Station – 5 (NCS5) Off Plot Project
  • NR ESDVs FRR PACO Support # NR CS3 and Zubair Hammar Mishrif
  • CS6 Compression Tie Ins
  • HM DGS Tie Ins
  • South Rumaila Mishrif Gas Sweetening Project – 5009
  • Zubair Hammar Permanent ST305 – HAMMAR MISHRIF – Plug In Compressor
  • Zubair Hammar Terminal TEG Dehydration Facility
  • Hammar Mishrif Additional Compression / Export Gas Pipeline Project
  • IPF Condensate Recovery Project
  • Zubair Oil Field Development Project
  •  Halfaya Project Surface Facility Phase Three
  • Oil Gathering Facilities Phase 4
  • Well Conversion Water Injection
  • Petronas Iraq Holding B.V Power Plant Project
  • GARRAF Field Development Project
  • FCP Offsite WC2 for GARRAF Operations
  • OGF Well pads for Petronas Carigali Iraq Holding B.V
  • Rumaila Oilfield Facilities – PWRI Project
  • Rumaila Tank Farm Project (RTFP) 
  • TAQA Atrush Production Facilities Project
  • Tawke Gas Injection Facility
  • CPF Heater Project 7002
  • Supply of Tie-In E&I Materials for FCGU System
  • Up-Gradation of DEO [Ethane (c2)] Flow Meter Skids in Train -1, 2 & 3 at Ruwais
  • NGL
– Flare Replacement
– OSBL Detailed Design Project
– Split Flow to KAZ
– BNGL Acceleration Project
– NR Fire Water System Upgrade Project| WG0209 | DP217
    • Umm Qasr
Rehabilitation of Switchgear Systems
Semi Refrigeration Jetty-2
Semi Refrigeration Jetty-3
DP83/DP83B Long Term LPG Export
TK09 Rehabilitation – Retractable Earthing System
Inspection Assessment & Rehabilitation of Umm Qasr Terminal Project
High Pressure Separator Tie In (Phase 2) Contract Area
  • KAZ
SS1 Phase 3 / SS1 Switchgear Replacement
Electrical Rehab 2017
12.2 LPG Overhaul
Eccb Building Modification
New Truck Loading Station (TLS) Feed
Substation 4 Extension
Pipelines & Tie Ins Project
FGS Upgrade
Fire Water Upgrade
Slug Catcher Pipeline Extension Project 
  • West Qurna
8 IOT New Train TIE-INS
DP18 CS7/CS8 Compression
CS6 Rehabilitation
Section 2 Wet Crude Treatment System (130) (WQ 1)
Crude Storage Tankage Pumps & Meters (T127) (WQ 1)
Produced Water Treatment Project (AWQ0109-1) (WQ 1)
Initial Oil Train Project (WQ 1)
Section 2 Project (WQ 1)
DS8 Produced Water Early Start Up (WQ 1)
Major Tie Ins DS6/DS8 Facilities (AWQ0303) (WQ 1)
Phase II Project
Construction of 42″ Dia Onshore Export Pipelines & Associates Works
Production well pad 11/1A and Associated Gathering System Expansion (Phase 2)
Dammam Decentralized Water Injection Facilities for Water Supply Wells (Phase 2)
 